Plot 35 & 35a foundations are laid and prepared for timber frame. After excavation a stone bed is levelled and rolled into the ground. Steel mesh sheets are tied in place on top of a polythene membrane. Wooden shutters are constructed to hold the concrete in shape while being pumped into the new footing.