Posts By: admin

Gelligaer – Near Completion

Completion of a new build four bedroom detached home is underway at Maxiom. The design provides a wealth of light through large windows and doors, some of which open out onto patios and verandas. The ground floor has two living spaces plus dining, utilities and kitchen areas. The owner designed the internal and external character of the home for a bespoke finish and individual touch. This six-month build is now nearing completion, and we are delighted to prepare to handover this new family home.

Gelligaer Road – Blockwork

Blockwork to DPC begins

Gelligaer Road – Raft Preparation

Raft shuttering and steelwork added ready for concrete.

Gelligaer Road – Rear Retaining

Two retaining walls constructed at the rear of the property to redirect the culvert and retain the compacted stone.