Posts By: admin

Gelligaer Road – Blockwork

Blockwork to DPC begins

Gelligaer Road – Raft Preparation

Raft shuttering and steelwork added ready for concrete.

Gelligaer Road – Rear Retaining

Two retaining walls constructed at the rear of the property to redirect the culvert and retain the compacted stone.

Gelligaer Road – Backfilling

Backfilling with stone rolled in.

Gelligaer Road Excavation

Deep Excavation at Gelligaer Road ready for backfilling with stone.